background image

TECHNICAL REFERENCE

LANTIME

M100/GPS

4th January 2021

Meinberg Funkuhren GmbH & Co. KG

Summary of Contents for LANTIME M100/GPS

Page 1: ...TECHNICAL REFERENCE LANTIME M100 GPS 4th January 2021 Meinberg Funkuhren GmbH Co KG ...

Page 2: ......

Page 3: ...t 13 3 Global Information LANTIME M100 GPS 14 4 Technical Specifications LANTIME Chassis 15 5 LANTIME M100 Front Connectors 18 5 1 AC DC Power Supply 19 5 2 Fuse 20 5 3 Status LEDs 20 5 4 Terminal 21 5 5 USB Port 21 5 6 Antenna Input GPS Reference Clock 22 5 7 10 100BASE T Network Port IEEE 803 2 23 6 Installation GPS Antenna 24 7 Technical Appendix GPS Antenna Accessories 28 7 1 Antenna Cable 30 ...

Page 4: ...inberg Funkuhren GmbH Co KG Lange Wand 9 31812 Bad Pyrmont Germany Phone 49 0 52 81 93 09 0 Fax 49 0 52 81 93 09 230 Internet https www meinbergglobal com Mail info meinberg de Date 04 01 2021 LANTIME Date 4th January 2021 1 ...

Page 5: ...ou may only continue if you have understood and fulfilled all requirements In this documentation dangers and indications are classified and illustrated as follows DANGER The signal word indicates an imminently hazardous situation with a high risk level This notice draws attention to an operating procedure or similar proceedings of which a non observance may result in serious personal injury or dea...

Page 6: ...siko eines elektrischen Schlages Caution risk of electric shock IEC 60417 5041 Vorsicht heiße Oberfläche Caution hot surface IEC 60417 6056 Vorsicht Gefährlich sich bewegende Teile Caution moving fan blades IEC 60417 6172 Trennen Sie alle Netzstecker Disconnection all power plugs IEC 60417 5134 Elektrostatisch gefährdete Bauteile Electrostatic Sensitive Devices IEC 60417 6222 Information generell ...

Page 7: ... be used for the purpose described in this manual In particular the given limits of the device must be observed The safety of the installation in which the unit is integrated is the responsibility of the installer Non observance of these instructions can lead to a reduction in the safety of this device Please keep this manual in a safe place This manual is intended exclusively for electricians or ...

Page 8: ... soiling additional measures e g Installation in an air conditioned control cabinet required Transport Unpacking Installation If the unit is brought into the operating room from a cold environment condensation may occur wait until the unit is temperature controlled and absolutely dry before operating it When unpacking setting up and before operating the equipment be sure to read the information on...

Page 9: ...work properly and are undamaged Pay particular attention to the facts that the cables do not have kinks or that they are not too short around corners and no objects are placed on the cables Also make sure that all connections are secure Faulty shielding or cabling will endanger your health electrical shock and may destroy other equipment Ensure that all necessary safety precautions have been taken...

Page 10: ...hat the mains socket on the appliance or the mains socket of the house installation is freely accessible to the user so that the mains cable can be pulled out of the socket in case of emergency Outside the assembly group the device must be disconnectable from the power supply in accordance with the provisions of IEC 62368 1 e g by the primary line protection Installation and disassembly of the pow...

Page 11: ...arth conductor via the protective earth connection terminal If an external earth connection is provided on the housing it must be connected to the equipotential bonding rail grounding rail The mounting parts without cable are not included in the scope of delivery Note Please use a grounding cable 1 5 mm2 Always pay attention to a correct crimp connection 8 Date 4th January 2021 LANTIME ...

Page 12: ... V Trigger Characteristic T slow Nominal Current A 2 5 Ampere Switching Capacity H high max Voltage 250 V AC Power Supply DC Power Supply Have the spare fuse ready pay attention to the correct rated current characteristics and type Important The fuse must be approved for operation at AC voltage Have the spare fuse ready pay attention to the correct rated current characteristics and type Important ...

Page 13: ...en the doors are closed cooling fire protection shielding against electrical magnetic and electromagnetic fields Switch off in fault service case By switching off the devices are not disconnected from the power supply In the event of a fault or service case the devices must be immediately disconnected from all power supplies Follow the steps below Switch off the device Disconnect all power plugs I...

Page 14: ... to considerable risks for the user and result in a loss of warranty as well as an exclusion of liability Danger due to moving parts keep away from moving parts Device parts can become very hot during operation Do not touch these surfaces If necessary switch off the unit before installing or removing any equipment and allow it to cool down 2 8 Handling Batteries CAUTION The lithium battery on the ...

Page 15: ...pare removal and installation of assemblies Unload yourself for example by touching a grounded object before touching assemblies Ensure that you wear a grounding strap on the wrist when working with such assemblies which you attach to an unpainted non conductive metal part of the system Use only tools and devices that are free from static electricity Transporting Assemblies Assemblies may only be ...

Page 16: ...he WEEE Directive The product symbol on the left indicates that this electronic product must not be disposed of in domestic waste Return and Collection Systems For returning your old equipment please use the country specific return and collection systems available to you or contact Meinberg The withdrawal may be refused in the case of waste equipment which presents a risk to human health or safety...

Page 17: ...only GPS and Galileo an IRIG time code receiver or a long wave receiver DCF77 MSF WWVB as well as external NTP servers or a DCF77 GNSS combination as hybrid receiver can be used as reference time source A GNSS synchronized LANTIME consists of a GNSS satellite receiver a single board computer with integrated network card and a power supply A simplified LINUX operating system is implemented on the s...

Page 18: ...ing Housing for DIN mounting rail Housing material aluminium Temperature range Operation 0 50 C 32 122 F Storage 20 70 C 4 158 F Relative humidity Operation max 85 Altitude Operation max 2000 m 6562 ft above sea level Acoustics 0 dB A IP protection class IP30 LANTIME Date 4th January 2021 15 ...

Page 19: ...Housing dimensions 16 Date 4th January 2021 LANTIME ...

Page 20: ...g disconnect all mains Avant d ouvrir I appareil débranchez tous les câbles d alimentation This connector must be wired to an equipotential bonding bar earthing bar The connection is located below the rail mount bracket at the backside of the device The mounting parts are not included in the scope of delivery LANTIME Date 4th January 2021 17 ...

Page 21: ...d time red the reference clock does not provide a valid time Time Service green NTP is synchronized to the reference clock e g GPS180 red NTP is not synchronized or switched to the local clock Network green all monitored network interfaces are connected Link up red at least one of the monitored network interfaces is faulty Alarm off no error red general error 18 Date 4th January 2021 LANTIME ...

Page 22: ...arameter Max power Pmax 40W Max heat emission Etherm 144 00 kJ h 136 49 BTU h 1 2 3 4 5 L 100 240 V 50 60 Hz 100 240 V N WARNING This equipment is operated at a hazardous voltage serial interfaces from the device Disconnect all signal lines such as antenna fault message relay contact and Please note the information in the chapter Important Safety Instructions Fuse Replacement Danger to life due to...

Page 23: ... and Please note the information in the chapter Important Safety Instructions Fuse Replacement Danger to life due to electrical shock Disconnect the device from the mains To do this press the disconnector Then loosen the locking screws of the supply plug if present and pull it off 5 3 Status LEDs Init blue Initialisation phase green warmed up oscillator is adjusted Signal green positioning complet...

Page 24: ...th 38400 Baud 8 Databits no parity and 1 Stopbit The terminal emulation have to set to VT100 After connecting to the timeserver there will be displayed the login message press RETURN for first connection default user root password timeserver CONSOLE 38400 8N1 DCD_IN RXD_IN TXD_OUT GND 3 4 5 6 7 5 5 USB Port All devices of the LANTIME M Series dispose a USB interface which can be used to plug in a ...

Page 25: ...age 15 V 100 mA via antenna cable Connection type BNC female N standard female Cable type shielded coax Cable length max 300 m to RG58 max 700 m to RG213 Antenna GNSS IF 15 V BNC N Norm N type Antenna GNSS IF 15 V WARNING Working on the antenna system during thunderstorms Danger to life due to electrical shock Do not carry out any work on the antenna system or the antenna cable if there is a risk ...

Page 26: ...0 100BASE T Network Port IEEE 803 2 Signal 100BASE T Data transmission rate 10 100 Mbit s Connection type 8P8C RJ45 Cable Copper twisted pair e g CAT 5 0 Duplex Modes Half Full Autonegotiaton 100M 10M LAN x LANTIME Date 4th January 2021 23 ...

Page 27: ...of the Antenna location To receive enough satellites select a location that allows an unobstructed view of the sky otherwise there may be problems with the synchronization of the system There should be no obstacle in the line of sight between the antenna and the satellites In addition the antenna must not be installed under high voltage lines or other electrical light or electric circuits Installa...

Page 28: ...tage peaks e g caused by lightning strikes can be transmitted via the antenna cable and may cause damage to the receiver The receiver is pro tected against these effects by using the MBG S PRO surge protection Being installed in a waterproof housing the MBG S PRO is also suitable for outdoor installation Mein berg recommends the indoor installation as soon as possible after the antenna cable enter...

Page 29: ...cket of the surge protection Earth cable to PE rail Cable circa 1 5 mm Ø attached to the surge protection as short as possible 4 The next step is to connect the supplied coaxial cable between the surge protector and receiver N Norm female N Norm male SMA female BNC female N Norm male N Norm female BNC male Receiver Antenna splitter SMA male M B G S P R O Optional 26 Date 4th January 2021 LANTIME ...

Page 30: ...iver must compensate the signal propagation time of the antenna cable therefore you need to enter the length of the antenna cable in meters or the compensation time in nanoseconds into the settings of your receiver Antenna Cable Length m The receiving satellite signal is delayed by the used coaxial cable Cable Delay Usage RG58U 5 ns m for GPS and GNS UC receivers H155 4 ns m for GNS and GNM receiv...

Page 31: ...7 Technical Appendix GPS Antenna Accessories Physical Dimensions 28 Date 4th January 2021 LANTIME ...

Page 32: ...ncy 1575 42 MHz Bandwidth 9 MHz Frequencies Mixed frequency 10 MHz IF frequency 35 4 MHz Connector N Norm female connector Form factor ABS plastic case for outdoor installation Protection class IP66 Humidity 95 Temperature range 40 C to 85 C 40 to 185 F Weight 1 6 kg 3 53 lbs incl mounting kit LANTIME Date 4th January 2021 29 ...

Page 33: ...d in the data sheet of the cable used 7 2 Antenna Short Circuit Only for assembly groups with front display In case of an antenna line short circuit the following message appears in the display ANTENNA SHORT CIRCUIT DISCONNECT POWER If this message appears the clock has to be disconnected from the mains and the defect eliminated After that the clock can be powered up again The supply voltage for t...

Page 34: ... CN UB 280DC BB is equipped with two type N female connectors It has no dedicated input output polarity or prefered mounting orientation Phoenix CN UB 280DC BB Features High RF Performance Multiple Strike Capability 20 kA Surge Protection Bi directional Protection Mounting type Connection specific intermediate plugging Type Attachment plug Direction of action Line Shield Earth Ground Maximum conti...

Page 35: ... typ 1 1 2 GHz Permissible HF power Pmax at VSWR xx 50 ohm system 700 W VSWR 1 1 200 W VSWR Capacity Core Earth typ 1 5 pF asymmetrical shield typ 1 5 pF Surge current resistance conductor ground C1 1 kV 500 A C2 10 kV 5 kA C3 100 A D1 2 5 kA Ambient temperature operation 40 C 80 C Altitude 2000 m above sea level Degree of protection IP55 Housing material Nickel plated brass Color nickel Dimension...

Page 36: ...7 Technical Appendix GPS Antenna Accessories 7 3 1 MBG S PRO Physical Dimensions 67 11 15 8 25 13 4 7 3 2 Installation and Grounding LANTIME Date 4th January 2021 33 ...

Page 37: ...ominated biphenyls PBBs and polybrominated diphenyl ethers PBDEs Bis 2 ethylhexyl phthalat DEHP Benzylbutylphthalat BBP Dibutylphthalat DBP Diisobutylphthalat DIBP above the legal threshold WEEE status of the product This product is handled as a B2B Business to Busi ness category product In order to secure a WEEE compliant waste disposal it has to be returned to the manufacturer Any transportation...

Page 38: ...und Richtlinien übereinstimmt to which this declaration relates is in conformity with the following standards and provisions of the directives RED Richtlinie ETSI EN 303 413 V1 1 1 2017 06 RED Directive 2014 53 EU EMV Richtlinie ETSI EN 301 489 1 V2 2 3 2019 11 EMC Directive ETSI EN 301 489 19 V2 1 1 2019 04 DIN EN 61000 6 2 2019 2014 30 EU DIN EN 61000 6 3 2007 A1 2011 DIN EN 55032 2015 DIN EN 55...

Reviews: