Page 2-6
2.3 Check list
2.3.1Check list for operation
ITEM
JOB
DESCRIPTION NO.
01
Read through operating manual thoroughly
02
Read through all instruction manual thoroughly
03
Lifting moving machine
04
Installing machine
05
Leveling machine
06
Lubricating instruction
07
Checking electrical circuit connection
08
Main switch and button ‘’ON’’
09
Press emergency stop button to stop machine
10
Learn safety rules
11
Simple trouble shooting
12
Maintenance
2.3.2 Check list for maintenance
ITEM
JOB
Interval
01
Clean machine (do not use air compressor)
Weekly
02
Check electrical circuit connection
Every time before operation
03
Replace coolant ant clean coolant tank
3 months
04
Clean motor
Annually
05
Check Slide (x axis)
Annually
06
Check Slide (z axis)
Semi-annually
07
Check Spindle tip
Annually
08
Check Automatic lubrication unit
Weekly
09
Add grease
Weekly
Summary of Contents for ATL 1820E
Page 5: ...1 SAFETY INSTRUCTIONS ...
Page 22: ...Page 1 17 ...
Page 24: ...2 MACHINE SPECIFICATIONS ...
Page 25: ...Page 2 1 2 MACHINE SPECIFICATIONS 2 1 Dimensional drawing ...
Page 27: ...Page 2 3 2 1 2 Chip Conveyor ...
Page 31: ...3 INSTALLATION ...
Page 34: ...3 1 2 Layout floor plan Following is a top view drawing ...
Page 43: ...4 MAINTENANCE ...
Page 55: ...5 CHUCK ...
Page 64: ...Page 7 3 7 1 HEADSTOCK 1 HEADSTOCK _ 18 SPINDLE BORE 58mm 2 ...
Page 65: ...Page 7 4 18 SPINDLE BORE 58mm 2 ...
Page 69: ...Page 7 8 7 2 BED Z AXIS TRANSMISSION ...
Page 71: ...Page 7 10 7 3 CARRIAGE CROSS SLIDE ...
Page 74: ...Page 7 13 7 4 TAILSTOCK MANUAL TAILSTOCK _ 18 ...