Fig. 40 Safety frame
2
Lift the ends of the wires, slide them into the
safety edge about 50 mm and lock with screws.
See pos 1.
Fig. 41 Fasten the safety frame
3
Fasten the safety frame with the two pairs of
screws under the platform on the left and right
side.
4
Adjust the position of the safety frame side-
ways before locking the two pairs of screws.
5
The distance between platform and safety
frame is to be 1-2 mm all the way around, ad-
just with screws under the platform.
5.7 SHAFT CONSTRUCTION
5.7.1 SHAFT BEAM
Fig. 42 Shaft beams in the mast
1
Slip in the shaft beam in the mast top (see pos
1,), fasten it with 2 pcs of screw tapping M6x16
FZ and nut M5.
2
Mount the shaft brackets (2 pcs) with 2 pcs of
screw tapping M6x16 FZ (see pos 2).
3
Release the inner beams (4 pcs of screw tap-
ping M6x16 FZ) and pull them out. See pos 3.
7000 100 en-GB AD
57
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...