Fig. 38 Horizontal check and centering check
Note:
When doing this do not stand on the platform ( if it is possible to avoid).
• Tighten the eight screws between platform and yoke.
5.6 ASSEMBLY THE SAFETY FRAME
5.6.1 SAFETY EDGE
1
Put the safety edge through the holes in the
top of the platform frame.
2
Check that the “sliding area” is clean and
lubricated.
Fig. 39 Safety edge
3
Hook the spring (see pos 1, Fig. 39
),
and fasten the nut and washer (see pos 2, Fig.
39
4
Tighten the two nuts so that the safety edge
works properly.
5
Check the function of the safety switch, it shall
stop the lift (cut the circuit) when pressed 5
mm.
6
Adjust the switch if necessary.
5.6.2
SAFETY FRAME
1
Put the safety frame in place around the
platform.
56
7000 100 en-GB AD
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...