Tripping hazard over cables etc.
Hazard of bulky parts tipping over
3.7 UNPACKING
The platform lift is normally delivered in two pallets with several parts.
The two pallets consist of:
Pallet one
• Mast
• Shaft parts
• Box with installation material and packing check list for pallet one
Pallet two
• Platform
• Doors*
*
• Wall panel
• Box with installation material and packing check list for pallet two
* If the lift has more than 3 stops and a long travel, the doors will be packed on a third pallet.
Pallet three*
• Doors
3.8 MATERIAL PREPARATIONS
• Remove the cover panels, safety edge and safety frame from the platform before moving it into the
building to avoid damage to the platform.
7000 100 en-GB AD
11
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...