• Tensiometer for belt tension
• Applicable drawing and circuit diagrams for the order.
For more detailed information regarding installation tool recommendations, see separate document.
3.2 SITE SURVEY
Confirm:
• that the installation site corresponds to approved drawing
• that the length of the mast is correct, depends on door configuration. - Full size door - Length from
top level floor to top of the mast, min 1055 mm - Half size door - Length from top level floor to top
of the mast, 1070±15 mm
• that the travel and top height corresponds to approved drawing
• that the pit corresponds with approved drawing
• that the hole through floor/pit plumb for lift corresponds to approved drawing
• that it is possible to fix door and structure
• that all floor levels are finished before installation
• that a bar in ceiling is in place. SWL 500 kg
• that there is lighting that provides 50 lux a the floor level in the shaft, in front of every door and out-
side the electrical cabinet
• that the supporting walls in the shaft are dust sealed
• that the shaft is cleaned out
• that the pit is painted with oil resistant paint
• that main electrical supply is provided at the electrical cabinet
• that there is a two way communication line provided
• that the power outlet is available near the lift
• that national rules and regulations for such an installation are not being contravened
For outdoor lifts, confirm:
• that the pit has an abundant floor drain (for rain water)
• that there is external 230 V supply (for ventilation /heating fan)
3.3 LIFTING POINTS
A lifting point/hook must be provided centrally to the shaft with a certified load of 500 kg SWL. The lift-
ing point (see pos 1) is illustrated in Fig. 2
6
7000 100 en-GB AD
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...