• Put the outer roof together outside of the lift, 10116, 10117 and 10118. Start with the middle section
and tilt the side sections to connect them with the middle. Before mounting the sections, seal the
joint-ends with Sealing strip 64142 and fixate together with screw. See picture below.
• Put the complete outer roof in position and fixate it with distance 64021 and screws, use screws with
rubber gasket.
• Lift the complete outer roof (be careful, it´s heavy) in position and fixate it with distance 64021 and
screws There shall be double distance (64021) at the front/door-side.
• Put the corners 10123 (3 pieces) in position, fixate them with silicone.
The function of the open corner is to let water run of the roof.
Fig. 116 Roof panels with sealing strips 64142
6.3 SPLIT MAST
6.3.1 TOP FIXATION
Normally the lifting screw is mounted in position but if the screw is delivered separated the mounting
instructions below shall be followed:
Fig. 117 Installation of top parts
Put the lifting screw in position and mount the parts
according to the following:
If split screw, we recommend that you put the lon-
gest part of the screw in the top of the mast.
• Pos 2 - Rubber washer
• Pos 3 - Plastic brushing
• Pos 4 - Washer
• Pos 5 - Bearing
• Pos 6 - Locking nut. The distance from the top of
the screw and down to the locking nut shall be
41mm. Tighten the two locking screws in the
locking nut (pos 6) with a force of 24 Nm.
Make sure that the locking screw are fitted with
Loctite (glue) from the factory.
• Pos 7, 8 and 9 - Belt disc, brushing and screws.
Mount the brushing pos 8 into the belt disc pos
7. Fixate the brushing pos 8 with the screw. Do
not tighten it at this moment.
• Mount the belt disc on the screw end and adjust
the level of the belt disc depending on electrical
7000 100 en-GB AD
109
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...