Fig. 33 Flat cable strapping
5.5 ADJUSTMENTS
CAUTION
The adjustments described in this chapter is very important for further installation and
to make the lift run smooth and quiet.
5.5.1 ADJUST THE GUIDE RAIL FRAMES
Before the adjustment of the rail guides the four guide shoes shall be loose, not press in the bottom
of the rail guides.
The procedure is; moving on the platform from top to bottom, or vice versa, check distance and if the
joints are smooth. If adjustments are necessary, release
all the screws
and adjust the distance and
smoothness at every joint. Tighten the screws when all the mast has correct distance and smooth joints.
The adjustment
• Check the distance between the guide rail framed from top to bottom, it is to be 800 ± 2 mm and
make sure that the insides of the guide rail frames are even at every joint. See Fig. 34
52
7000 100 en-GB AD
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...