Instruction, how to use the lift
7
INSTRUCTION, HOW TO USE THE LIFT
When the lift is installed the installation team need to go through the Safety Check list. In the end of
the Safety Check list there is an instruction where the Installation team shall instruct the owner (user/
customer) how the use the lift and which the emergency procedures are.
Here below is the list of what instruction the installation team need to inform the user/customer about:
7.1 USING THE LIFT
Inform the owner (user/customer):
• Intended use is transport of persons.
• Functions and buttons on control panel and call stations.
• What the maximum load is.
• Operating temperature range.
• What the function “hold to run” mean. Optional.
• What the function “Automatic door-locking” is. Optional.
• How door openers and door closers work. Optional.
7.2 LABELS
Inform the owner(user/customer) of labels and signs:
• Emergency lowering /opening label.
• Mains circuit breaker, electrical cabinet and emergency lowering label.
• CE-mark
7.3 SAFETY & EMERGENCY
Inform the owner (user/customer):
• How the safety edges on the platform edges and the top of the platform control panel works.
• That no one (children) should play in the lift.
• About the function of the Emergency stop button on the control panel.
• About the function of the On-board alarm button, external bell and alarm telephone.
• To not use the lift in case of fire.
• About the procedure for emergency lowering and emergency opening of doors.
• What will happen in case of a power failure.
7.4 CARE & MAINTENANCE
Inform the owner (user/customer):
• What maintenance can be done by the user.
• Maintenance need to be done by authorized supplier.
• How to handle used components.
7000 100 en-GB AD
137
Summary of Contents for 7000
Page 1: ...Vector Installation Manual HQ ...
Page 23: ...ASSEMBLY 5 ASSEMBLY 5 1 FIXINGS 7000 100 en GB AD 19 ...
Page 25: ...ASSEMBLY Fig 15 Mast preparation before installation 7000 100 en GB AD 21 ...
Page 27: ...ASSEMBLY Lift the top section 7000 100 en GB AD 23 ...
Page 33: ...ASSEMBLY 7000 100 en GB AD 29 ...
Page 34: ...ASSEMBLY 30 7000 100 en GB AD ...
Page 42: ...ASSEMBLY The mast shall stand upright the tolerance is Max 2 mm m 38 7000 100 en GB AD ...
Page 70: ...ASSEMBLY Fig 59 Mounting of Filled wall panels 66 7000 100 en GB AD ...
Page 72: ...ASSEMBLY Fig 61 Principal drawing Shaft corners 68 7000 100 en GB AD ...
Page 100: ...This page is intentionally left blank 96 7000 100 en GB AD ...
Page 117: ...OPTIONS Fig 126 Electrical connections external door opener 7000 100 en GB AD 113 ...
Page 140: ...This page is intentionally left blank 136 7000 100 en GB AD ...
Page 142: ...This page is intentionally left blank 138 7000 100 en GB AD ...