3.9 Initial test before commissioning
Protective earth
Before supplying power to the robot and commissioning, verify that the cabinet is
connected to protective earth according to
protective earth to the controller on page 83
Function tests
Before commissioning, perform the function tests in section
to verify that the safety features work properly.
158
Product manual - OmniCore V400XT
3HAC081697-001 Revision: A
© Copyright 2022-2023 ABB. All rights reserved.
3 Installation and commissioning
3.9 Initial test before commissioning