
Refitting the cable harness to the upper arm
Note
Action
Torx pan head screw: M6x16 A4-80
Refit the metal clamp beneath the arm
house.
1
Tightening torque: 10 Nm.
xx2200002142
xx1300000668
Tip
Use tape and tie the axis-5 and axis-6
connectors and carrier into a bundle (if not
already done). This is done to facilitate the
procedure and to avoid damaging the parts
during the procedure.
This will also make it easier to run the cable
harness through the inside of the robot.
2
Continues on next page
Product manual - IRB 6710
549
3HAC085695-001 Revision: A
© Copyright 2023 ABB. All rights reserved.
5 Repair
5.8.3 Replacing the axis-3 gearbox
Continued
Summary of Contents for IRB 6710
Page 1: ...ROBOTICS Product manual IRB 6710 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 584: ...This page is intentionally left blank ...
Page 614: ...This page is intentionally left blank ...
Page 634: ...This page is intentionally left blank ...
Page 639: ......