Make sure that …
The insulation resistance of the input power cable, motor cable and motor is measured
according to local regulations and the manuals of the drive.
The drive is attached securely on an even, vertical and non-flammable wall.
The cooling air flows freely in and out of the drive.
If the drive is connected to a network other than a symmetrically grounded TN-S system:
You have done all the required modifications (for example, you may need to disconnect
the EMC filter or ground-to-phase varistor). See the electrical installation instructions.
Appropriate AC fuses and main disconnecting device are installed.
There is an adequately sized protective earth (ground) conductor(s) between the drive
and the switchboard, the conductor is connected to correct terminal, and the terminal is
tightened to the correct torque.
Proper grounding has also been measured according to the regulations.
The input power cable is connected to the correct terminals, the phase order is correct,
and the terminals are tightened to the correct torque.
There is an adequately sized protective earth (ground) conductor between the motor and
the drive, and the conductor is connected to the correct terminal, and the terminal is
tightened to the correct torque.
Proper grounding has also been measured according to the regulations.
The motor cable is connected to the correct terminals, the phase order is correct, and the
terminals are tightened to the correct torque.
The motor cable is routed away from other cables.
No power factor compensation capacitors are connected to the motor cable.
The control cables are connected to the correct terminals, and the terminals are tightened
to the correct torque.
If a drive bypass connection will be used: The direct-on-line contactor of the motor and
the drive output contactor are either mechanically and/or electrically interlocked, that is,
they cannot be closed at the same time. A thermal overload device must be used for
protection when bypassing the drive. Refer to local codes and regulations.
There are no tools, foreign objects or dust from drilling inside the drive.
The area in front of the drive is clean: the drive cooling fan cannot draw any dust or dirt
inside.
Drive covers and cover of the motor connection box are in place.
The motor and the driven equipment are ready for power-up.
140 Installation checklist
Summary of Contents for ACS880-11
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 11 drives Hardware manual ...
Page 2: ......
Page 4: ......
Page 26: ...26 ...
Page 52: ...52 ...
Page 82: ...82 ...
Page 95: ...R6 R8 IP21 R6 R8 IP55 Electrical installation IEC 95 ...
Page 103: ...R6 1 5 N m 0 5 N m Electrical installation IEC 103 ...
Page 104: ...R8 1 5 N m 0 5 0 6 N m 104 Electrical installation IEC ...
Page 116: ...R6 R8 UL Type 1 R6 R8 UL Type 12 116 Electrical installation North America NEC ...
Page 142: ...142 ...
Page 154: ... Fan arrow must point up 154 Maintenance ...
Page 160: ...160 ...
Page 181: ... Package dimensions R6 R3 R8 Technical data 181 ...
Page 202: ...R3 IP21 UL Type 1 3AXD50000045323 202 Dimension drawings ...
Page 203: ...R3 Option B056 IP55 UL Type 12 3AXD50000045322 Dimension drawings 203 ...
Page 204: ...R6 IP21 UL Type 1 3AXD50000045353 204 Dimension drawings ...
Page 205: ...R6 Option B056 IP55 UL Type 12 3AXD50000045352 Dimension drawings 205 ...
Page 206: ...R8 IP21 UL Type 1 3AXD50000047667 206 Dimension drawings ...
Page 207: ...R8 Option B056 IP55 UL Type 12 3AXD50000047667 Dimension drawings 207 ...
Page 208: ...208 ...
Page 225: ... Declarations of conformity The Safe torque off function 225 ...