![background image](http://html.mh-extra.com/html/abb/acs880-11/acs880-11_hardware-manual_2643102.webp)
1. Stop the drive and do the steps in section
Electrical safety precautions (page 15)
before you start the work.
2. Remove the front cover(s) if not already removed.
3. For frame R3: Pull the control panel holder up.
4. Cut an adequate hole into the rubber grommet and slide the grommet onto the cable.
Slide the cable through a hole in the bottom plate and attach the grommet to the
hole.
5. Route the cable as shown in the figures below.
6. Ground the outer shield of the cable 360 degrees under the grounding clamp at the
cable entry. Keep the cable unstripped as close to the terminals of the control unit
as possible. Secure the cables inside the drive mechanically.
7. Frame R3: Ground the pair cable shields and grounding wires under the grounding
clamp screw at the cable entry.
Frame R6 and R8: Ground the pair cable shields and grounding wire under the
clamp screw below the control unit.
8. Connect the conductors to the appropriate terminals of the control unit and tighten
to 0.5 … 0.6 N·m. See
Default I/O diagram of the drive control unit
.
Note:
• Leave the other ends of the control cable shields unconnected or ground them
indirectly through a high-frequency capacitor with a few nanofarads, eg, 3.3 nF /
630 V. The shield can also be grounded directly at both ends if they are in the same
ground line with no significant voltage drop between the end points.
• Keep any signal wire pairs twisted as close to the terminals as possible. Twisting
the wire with its return wire reduces disturbances caused by inductive coupling.
Example wirings are shown below.
102 Electrical installation – IEC
Summary of Contents for ACS880-11
Page 1: ... ABB INDUSTRIAL DRIVES ACS880 11 drives Hardware manual ...
Page 2: ......
Page 4: ......
Page 26: ...26 ...
Page 52: ...52 ...
Page 82: ...82 ...
Page 95: ...R6 R8 IP21 R6 R8 IP55 Electrical installation IEC 95 ...
Page 103: ...R6 1 5 N m 0 5 N m Electrical installation IEC 103 ...
Page 104: ...R8 1 5 N m 0 5 0 6 N m 104 Electrical installation IEC ...
Page 116: ...R6 R8 UL Type 1 R6 R8 UL Type 12 116 Electrical installation North America NEC ...
Page 142: ...142 ...
Page 154: ... Fan arrow must point up 154 Maintenance ...
Page 160: ...160 ...
Page 181: ... Package dimensions R6 R3 R8 Technical data 181 ...
Page 202: ...R3 IP21 UL Type 1 3AXD50000045323 202 Dimension drawings ...
Page 203: ...R3 Option B056 IP55 UL Type 12 3AXD50000045322 Dimension drawings 203 ...
Page 204: ...R6 IP21 UL Type 1 3AXD50000045353 204 Dimension drawings ...
Page 205: ...R6 Option B056 IP55 UL Type 12 3AXD50000045352 Dimension drawings 205 ...
Page 206: ...R8 IP21 UL Type 1 3AXD50000047667 206 Dimension drawings ...
Page 207: ...R8 Option B056 IP55 UL Type 12 3AXD50000047667 Dimension drawings 207 ...
Page 208: ...208 ...
Page 225: ... Declarations of conformity The Safe torque off function 225 ...