
4 Setting Up with the Personal Computer
43
43
IM 54051-E
Preparation for
Measurement
4.5
Transmitting the setup data to the main unit
If the setup operation for the personal computer has been completed, transmit the setup data
of the tag, log, and operator name to the main unit.
Tag setup data and log setup data will be transmitted in a batch and as one file. The operator
data will be transmitted separately.
NOTE
If the setup data is transmitted to the main unit, the setup data and measurement data
that existed in the main unit before transmission will be deleted.
■
Preparation for transmission
1.
Confirm that the power to the personal computer and main unit is OFF.
2.
Connect the personal computer and main unit with the supplied cable.
See Also
For information about connecting the personal computer and main unit, refer to “
■
Connecting the
personal computer and main unit” in section 4.1.
3.
Turn on the power of the main unit.
See Also
For information about turning on the power to the main unit, refer to “4 Turn ON/OFF of the Power
Supply” in the “Information Required before Use” part.
4.
Turn on the power of the personal computer.
Now it is ready for transmission.
-End of procedure-