![wtw TresCon UNO A111 Скачать руководство пользователя страница 70](http://html1.mh-extra.com/html/wtw/trescon-uno-a111/trescon-uno-a111_operating-manual_1000694070.webp)
Operation
TresCon UNO
5 - 14
ba43134e08
05/2017
5.2
Measured values
5.2.1
Daily/weekly load diagram
The analyzer provides data storage. The data of the data storage can
be shown in the form of graphs:
Daily load diagram
Weekly load diagram
Monthly load diagram
Each graph shows the measured values for the selected period of time
(days, weeks, months).
Memory capacity
The data storage records the values at 5-minute intervals. The memory
capacity comprises 8064 values that is equivalent to 28 days per graph.
If the memory is full, the oldest value is overwritten.
Calling up graphs
Parameter
Values
Selection line (without any desig-
nation)
Daily load diagram, Weekly load
diagram, Monthly load diagram
Measured variable
Yes, No
Depending on the analyzer
module, several measured vari-
ables (one main measured varia-
ble and further secondary
measured variables) may be
available
1
Measuring mode
Call up the
General Parameters
menu: Simultaneously press
the keys,
3
and
2
.
2
Select the
Daily/weekly load diagram
menu item with
68
and confirm with
3
. The analyzer module and
the value
Yes
or
No
are displayed.
Содержание TresCon UNO A111
Страница 2: ...2 ba43134e08 05 2017 TresCon UNO Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany...
Страница 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Страница 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Страница 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Страница 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Страница 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Страница 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Страница 207: ......