![wtw TresCon UNO A111 Скачать руководство пользователя страница 25](http://html1.mh-extra.com/html/wtw/trescon-uno-a111/trescon-uno-a111_operating-manual_1000694025.webp)
TresCon UNO
Installation
3 - 7
ba43134e08
05/2017
Connecting the overflow
vessel
Fig. 3-8
Tubes of the overflow vessel
Note
The back connection piece of the overflow vessel is for aeration. It must
not be closed.
13
Insert both free ends of the drain set in a suitable, pressure-free
drain.
14
Connect the overflow vessel to the following connectors (see
Fig. 3-8):
– Connect the sample or permeate tube (black tube, inner dia-
meter = 6 mm) to the front connection piece of the overflow
vessel.
– Connect the sample overflow (center connection piece) to
the drain set.
Tube: Inner diameter = 6 mm, black.
– Lead the permeate tube of the analyzer module (black
tubing, inner diameter = 1.5 mm) through the left-hand dril-
ling in the TresCon UNO enclosure bottom and connect it to
the fitting of the overflow vessel.
drain
O
I
P1
to measuring
module
sample
(permeate)
sample
(permeate)
Содержание TresCon UNO A111
Страница 2: ...2 ba43134e08 05 2017 TresCon UNO Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany...
Страница 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Страница 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Страница 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Страница 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Страница 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Страница 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Страница 207: ......