![wtw TresCon UNO A111 Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/wtw/trescon-uno-a111/trescon-uno-a111_operating-manual_1000694033.webp)
TresCon UNO
Installation
3 - 15
ba43134e08
05/2017
Switching voltages and switching currents on the relay contacts
must not exceed the values specified in chapter 7 T
.
Protect electrical circuits against currents that are too high with an
electrical fuse.
The mounting frame may only be opened after the installation if all
external voltages have been previously switched off.
The analyzer has programmable control, indicator and alarm contacts.
Warning
If the load at an indicator contact is inductive, an RCD protective circuit
is required! For an example of the circuit, see Fig. 3-14.
Содержание TresCon UNO A111
Страница 2: ...2 ba43134e08 05 2017 TresCon UNO Copyright 2017 Xylem Analytics Germany GmbH Printed in Germany...
Страница 6: ...Inhaltsverzeichnis TresCon UNO 0 4 ba43134e08 05 2017 9 1 Abbreviations 9 1 9 2 Index 9 1...
Страница 18: ...Safety TresCon UNO 2 4 ba43134e08 05 2017...
Страница 56: ...Initial commissioning TresCon UNO 4 4 ba43134e08 05 2017...
Страница 133: ...TresCon UNO Operation 5 77 ba43134e08 05 2017 9 Select Yes or No with 68 and confirm with 3...
Страница 167: ...TresCon UNO Maintenance 6 11 ba43134e08 05 2017 6 Leave the menu with 4...
Страница 202: ...Appendix TresCon UNO 8 24 ba43134e08 05 2017...
Страница 207: ......