![wtw inoLab 740 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/wtw/inolab-740/inolab-740_operating-manual_1000561021.webp)
Commissioning
21
Perform the following activities before commissioning the
system:
l
Prepare the measuring module
l
Connect the probe
l
Connect the terminal
l
Connect the plug-in power supply
l
Connect the system upgrades
Preparing the
module
1
Place the measuring module on a flat surface and
protect it from intense light and heat.
2
Insert the stand rod (2) into the measuring module.
3
Fix the probe holder (9) onto the stand rod.
4
Adjust the height of the probe holder (9) using the
locking key (10).
Содержание inoLab 740
Страница 18: ...Safety 18...
Страница 27: ...Commissioning 27...
Страница 32: ...Commissioning 32...
Страница 50: ...Basic principles of operation 50...
Страница 92: ...pH 92...
Страница 134: ...Ion concentration 134...
Страница 148: ...Dissolved oxygen D O 148...
Страница 174: ...BOD 174...
Страница 232: ...Data output 232...
Страница 236: ...Maintenance cleaning disposal 236...
Страница 270: ...Lists 270...
Страница 274: ...Lists 274...