3 Repairs
Copyright © WOODLEY EQUIPMENT COMPANY LTD.
95
Installation
⚫
All the wirings need to be set up according to the working procedures or the original positions of
the machine components to prevent them from being crushed or otherwise damaged.
⚫
Pay special attention to the tubing joints and ensure that the connections are sound.
⚫
The aperture, seal gasket, and seal ring need to be correctly positioned and oriented in the right
direction.
Follow the corresponding disassembly steps in reverse order.
Resetting the Machine
1. Reinstall the shield case cover.
2. Close the right side door.
3. Plug the power cord into the back panel of the device and turn on the power switch on the left
panel of the device.
3.9 Main Control Panel Replacement
Purpose
The main control panel can be disassembled and replaced by following the procedures specified in
this section; however, in each case,
3.2 Preparatory Work before Repairs
you begin.
Tools/Spare Parts
⚫
Phillips screwdriver
⚫
Corresponding specifications needed to replace the main control panel
Preliminary Steps
1. Pull out the power cord plug from the rear panel of the analyser, and turn off the power switch.
2. Disassemble the screws on the back panel of housing and remove the back panel of the
housing.
Disassembly
1. Pull out the peripheral wires and connectors attached to the main control panel.
2. As shown in Figure 3-29, disassemble four M4×8 cross recessed pan-head combination screws
fixing the main control panel, and remove the main control panel.
Содержание InSight V5
Страница 1: ...DMR MB 007 1 5...
Страница 126: ...7 Maintenance Inventory Copyright WOODLEY EQUIPMENT COMPANY LTD 120...
Страница 127: ...7 Maintenance Inventory Copyright WOODLEY EQUIPMENT COMPANY LTD 121...