EUROBLOC
SERVICE MANUAL FOR HOIST
63/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
7.1.4.4 Construction of pressure roller for hoist frame size: VT1, VT2, VT3
1. Pressure roller
2. Intermediate shaft
Disassembly
1
2
Lower hook to the floor and switch OFF the power supply to
the hoist. Remove the machinery covers.
Remove the adjustment screw (3) which is touching the limit
switch.
3
4
Remove the springs and fixing nuts (4) from the locking
screws and remove the pressure roller (1) from the fixing
plate.
Remove the nuts and bolts in order to remove the fixing plate
(6) from the support plate (7).
Reassembly
1
2