EUROBLOC
SERVICE MANUAL FOR HOIST
166/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Disassembly
1
2
Lower the hook onto a stable working-platform. Pull with a
gloved hand some extra rope down from the drum, so that
the hook-block is free. If needed, adjust the lower limit
switch. Switch OFF the power supply to the hoist.
Remove the shaft fixing parts (8). Remove the cross bar
fixing parts (7).
3
4
Remove the screws in order to remove side plates (6).
Remove rope sheave (10) along with bearing set (9) and
shaft assembly (8) by removing the snap ring on other side
of the shaft. Remove the sheave cover screws and remove
the sheave cover plates (5).
5
Remove the locking set (2) and separate the hook (1) and
thrust bearing (4) from the cross bar (3).