EUROBLOC
SERVICE MANUAL FOR HOIST
179/212
This document and the information contained herein, is the exclusive property of Verlinde S.A.S. and represents a non-public, confidential and proprietary trade secret that
may not be reproduced, disclosed to third parties, altered or otherwise employed in any manner whatsoever without the express written consent of Verlinde S.A.S.
Copyright © (2013) Verlinde S.A.S. All rights reserved.
06/2015
Reassembly
1
2
Insert the rope (1) into the rope anchorage (2)
Turn rope (1) back to rope anchorage (2). Insert the wedge (3)
into the rope anchorage (2), making sure that a length of at
least six times the rope diameter protrudes from the
anchorage.
Note: Make sure that the rope enters the anchorage in the correct direction. See section: “Rope Anchorage,
Service” for details.
3
4
Place the rope anchorage (2) into the overload device and
insert the shaft (7) with the washer (6).
Assemble the rope clamps (4) on the protruding end of the
rope (1) and insert the split-pin (5). Bend the split-pin (5) open.
Note: Insert a new cotter pin. Do not reuse a removed cotter pin.
Note: It is important that the rope anchorage is correctly mounted in the overload device. See the following
table for details: