146
OPERATIONS AND TECHNICAL REQUIREMENTS
CORRECTIVE
ACTIONS
CH
ECKED BY
16. Blow the filter with chip detector with compressed air. 17. Reinstall the filter with chip
detector (Ref. Task Card No. 250). 18. Reinstall the spark plugs (Ref. 074.20.02, Task Card No.
202).
19. Install and lock the drain plugs of suction pipes of cylinders Nos 4 through 6.
20. Remove the plug from the generator drive.
21. Wash the generator drive space with clean gasoline.
22. Unlock and drive out the generator drive plug and drain remaining grease (Ref. Task
Card No. 256).
23. Install the generator on the engine (Ref. 024.30.01, Task Card No. 201). 24. Install
the air compressor filtering element, meahes and spring. 25. Install plugs on the cylinder exhaust
ports.
26. Perform internal depreservation of the carburetor (Ref. 073.10.03, Task Card No.
202).
27. Drain oil from the fuel pump interior:
(1) Connect a hose of the engine preservation unit filled with clean gasoline B-70 to the
inlet connection of the gasoline pump.
(2) Create a pressure of 0.15 to 0.25 kgf/cm in the unit. (3) Turn the airscrew shaft till
preservation grease is fully removed.
28. Disconnect the hose from the fuel pump inlet connection.
Содержание M-14P
Страница 6: ...19 Engine M 14P Front View Figure 1...
Страница 7: ...20 Engine M 14P Rear View Figure 2...
Страница 27: ...40 Arrangement of Airborne Tools in Case Figure 1...
Страница 39: ......
Страница 44: ...57 Engine M 14P Test Run Chart Figure 201...
Страница 67: ...80...
Страница 163: ...176 Crankshaft Thrust Ball Bearing Front Cover Figure 1 Intermediate Crankcase Figure 2...
Страница 166: ...179 Intermediate Grankcase Front Portion Figure 3 Intermediate Crankcase Rear Portion Figure 4...
Страница 173: ...186 Front view Cylinder Figure 1 Rear view...
Страница 174: ...187 1 Inlet Valve 2 Outer Spring 3 Inner Spring 4 Split Retainer 5 Valve Plate Inlet Valve Figure 2...
Страница 178: ...191 Intake Pipe of Cylinders Nos 4 5 and 6 Figure 4 Piston Piston Rings and Piston Pin with Plugs Figure 5...
Страница 180: ...193 Timing Mechanism Schematic Diagram Figure 6 Cam Plate Figure 7...
Страница 189: ...Blower Longitudinal Section View Figure 1...
Страница 191: ...Rear view Mixture Collector Figure 2 Diffuser Figure 3...
Страница 194: ...1 Plate 2 Spring 3 Plate 4 Gear 5 Accessory Drive Shaft Blower Coupling Figure 4...
Страница 204: ...Oil Sump Figure 4...
Страница 216: ...Engine M 14P Gear Train Figure 1...
Страница 247: ...Carburetor AK 14P Operation Diagram Figure 1...
Страница 249: ......
Страница 267: ...OPERATIONS AND TECHNICAL REQUIREMENTS CORRECTIVE ACTIONS CH ECKED BY Carburetor AK 14P Right Side View Figure 201...
Страница 273: ...Carburetor Altitude Control Needle Position Versus Barometric Pressure Barometric Graph Figure 203...
Страница 274: ......
Страница 282: ......
Страница 283: ......
Страница 288: ...T t en 0 CO 0 T K D fi h0 Ol f 01 3 0 F4...
Страница 293: ......
Страница 309: ...SPARK PLUG SD 49SMM MAINTENANCE PRACTICES 1 LIST OF TASK CARDS Title Task Card Uo Removal 201 Installation 202...
Страница 344: ...Generator Electrical Connection Diagram Commutator Side View Figure 3 1 Main Pole 2 Interpole...
Страница 355: ......
Страница 358: ......