87
TO M-14P MS
TASK CARD No. 222
MS ITEM
072.30.00b
PROCEDURE: Check of Cylinder Intake Pipes for Condition
OPERATIONS AND TECHNICAL REQUIREMENTS
CORRECTIVE ACTIONS
CH
ECKED BY
1. Check condition and attachment of the cylinder intake pipes.
T.R.
Loosening of cylinder intake pipe attachment nuts is not allowed.
Dents, cracks on cylinder intake pipes are not allowed. Traces of fuel leakage are not
allowed.
2. Make sure the drain plugs of the intake pipes of cylinders Nos 4, 5, 6 are reliably
installed and locked.
T.R.
Damaged locking, loosening of drain plugs are not allowed.
Leakage of fuel through plugs is not allowed.
Tighten loose attachment
nuts of pipes. Replace damaged
intake pipes. Eliminate fuel
leakage through joints by re-
placing gaskets and tightening
nuts
Tighten loose drain
plugs. Eliminate leakage, replace
locking
TEST EQUIPMENT
TOOLS AND FIXTURES
MATERIALS
Wrench 14-24-571 Pliers, flat-nosed 150 Pin
Bar, handle 12x350 UB-24-53 Wrench 11x14 14-24-
861 Wrench 10-32-12
Содержание M-14P
Страница 6: ...19 Engine M 14P Front View Figure 1...
Страница 7: ...20 Engine M 14P Rear View Figure 2...
Страница 27: ...40 Arrangement of Airborne Tools in Case Figure 1...
Страница 39: ......
Страница 44: ...57 Engine M 14P Test Run Chart Figure 201...
Страница 67: ...80...
Страница 163: ...176 Crankshaft Thrust Ball Bearing Front Cover Figure 1 Intermediate Crankcase Figure 2...
Страница 166: ...179 Intermediate Grankcase Front Portion Figure 3 Intermediate Crankcase Rear Portion Figure 4...
Страница 173: ...186 Front view Cylinder Figure 1 Rear view...
Страница 174: ...187 1 Inlet Valve 2 Outer Spring 3 Inner Spring 4 Split Retainer 5 Valve Plate Inlet Valve Figure 2...
Страница 178: ...191 Intake Pipe of Cylinders Nos 4 5 and 6 Figure 4 Piston Piston Rings and Piston Pin with Plugs Figure 5...
Страница 180: ...193 Timing Mechanism Schematic Diagram Figure 6 Cam Plate Figure 7...
Страница 189: ...Blower Longitudinal Section View Figure 1...
Страница 191: ...Rear view Mixture Collector Figure 2 Diffuser Figure 3...
Страница 194: ...1 Plate 2 Spring 3 Plate 4 Gear 5 Accessory Drive Shaft Blower Coupling Figure 4...
Страница 204: ...Oil Sump Figure 4...
Страница 216: ...Engine M 14P Gear Train Figure 1...
Страница 247: ...Carburetor AK 14P Operation Diagram Figure 1...
Страница 249: ......
Страница 267: ...OPERATIONS AND TECHNICAL REQUIREMENTS CORRECTIVE ACTIONS CH ECKED BY Carburetor AK 14P Right Side View Figure 201...
Страница 273: ...Carburetor Altitude Control Needle Position Versus Barometric Pressure Barometric Graph Figure 203...
Страница 274: ......
Страница 282: ......
Страница 283: ......
Страница 288: ...T t en 0 CO 0 T K D fi h0 Ol f 01 3 0 F4...
Страница 293: ......
Страница 309: ...SPARK PLUG SD 49SMM MAINTENANCE PRACTICES 1 LIST OF TASK CARDS Title Task Card Uo Removal 201 Installation 202...
Страница 344: ...Generator Electrical Connection Diagram Commutator Side View Figure 3 1 Main Pole 2 Interpole...
Страница 355: ......
Страница 358: ......