3.0 Receiver Setup and Operation
- 17 -
3.1.1 Receiver Installation
Sur-Gard recommends testing the receiver before actual installation. Becoming familiar with the connections and setup of the unit on the workbench
will simplify the final installation.
The following items are required:
l
1 IEC power supply cord per SG-PSU5
l
Philips #1 screwdriver
l
Phillips #2 screwdriver
l
5/16” [or 8mm] nut driver
l
Depending on rack mounting:
l
8 clip nuts for the 19” rack
l
8 screws to fit into the clip nuts
1. Unpack the components for the SG-System 5.
NOTE: Carefully unpack the receiver and inspect for shipping damage. Notify the carrier immediately of any apparent damage.
2. Mount the rails to the 19” rack:
a. Slide the rails together.
b. Insert the clip nuts into the 19” rack 1U apart on the front and the back of the rack, leaving minimum 4U of space from the bottom of
the rail.
c. Place the rails and then secure in place with rack screws (four per rail, two on the front and two on the back).
d. Unfasten the front rail screws and set aside.
FIGURE 3-4: Rail Installation
NOTE: Maximum distance between front and rear rails is 31 inches (78.74 cm)
3. Slide the SG-MLRF5 subrack onto the rails. Caution: This component is heavy and requires two people to lift. Keep fingers clear of rails.
4. Unfasten the thumb screws and open the front plate.
5. Fasten the thumb screw set aside from the rails.
S
G
-S
ys
te
m
5
O
pe
ra
ti
ng
M
anua
l
Содержание SG-System 5
Страница 68: ...6 0 Options 68 Automation Mode Diagrams FIGURE 6 1 Flow Diagram for Loop Mode 0 SG System 5 Operating Manual ...
Страница 69: ...6 0 Options 69 FIGURE 6 2 Flow Diagram for Fallback Mode 1 SG System 5 Operating Manual ...
Страница 70: ...6 0 Options 70 FIGURE 6 3 Flow Diagram for All Mode 2 SG System 5 Operating Manual ...
Страница 71: ...6 0 Options 71 FIGURE 6 4 Flow Diagram for IP Fallback Mode 3 SG System 5 Operating Manual ...