![Twister T-ZERO Скачать руководство пользователя страница 53](http://html1.mh-extra.com/html/twister/t-zero/t-zero_maintenance-and-cleaning-manual_1184692053.webp)
52
2. Move the tumblers side to side with the belt installed, and position the
tumbler so the belt is straight.
3. Lower rollers “A” and “B” (see diagram above) down so they contact the
angled face of the tumbler. Ensure the sub-lid clamps are fully tightened
during this step.
Note: These instructions assume the right side of the image is the feed side of the
machine. If feeding from the left side of the image, adjust rollers “C” and “D” first.
4. Rotate the tumbler by hand after alignment to ensure belt is straight and
does not wobble. (Following step located on next page.)
Содержание T-ZERO
Страница 1: ...T ZERO Maintenance and Cleaning Manual 21 10098A_REV00 Version 1 0 March 2020...
Страница 8: ...7 TRIMMER OVERVIEW...
Страница 9: ...8...
Страница 10: ...9 HORIZONTAL CYCLONE OVERVIEW...
Страница 11: ...10 HEPA FILTER STACK HFS OVERVIEW...
Страница 12: ...11 CONVEYOR OVERVIEW...
Страница 20: ...19...
Страница 27: ...26 3 Check the chutes to ensure they are not interfering with the conveyor belt or tumbler after adjustment...
Страница 29: ...28 5 Loosen the tumbler lid knobs and lift the tumbler lids...
Страница 31: ...30 8 Repeat steps 5 to 7 to remove the second tumbler 9 If vacuum bars are installed pull them to remove...