Drying
The instruments are dried internally and externally with filtered
hot air. Good drying reduces the risk of corrosion caused by
the residual humidity on the load.
Instruments with a very small internal diameter must be dried
further.
WARNING. The program can be interrupted at any time.
However, it must be remembered that once interrupted, it
must restart from the beginning. Only if it is interrupted in
the drying phase can the cycle be considered completed
successfully. The instruments must be dried.
6.5.3 Program End
The message «Successfully completed» on the display indi-
cates that the program has been carried out correctly. Unlock
the door by pressing the key (5 Fig. 12) and open it.
Open the door immediately after the end of the program to
avoid condensation forming.
Check the results at the end of the cleaning process.
The instruments must be completely clean and dry.
Hollow instruments with a small internal diameter must be
dried further with air.
- Check hollow instruments and retreat them if necessary.
- The hole (lumen) of hollow instruments must be free.
- The injectors must be correctly placed on the connection
tube in the cleaning chamber.
- The nozzles and connections to the base grid must be firmly
fixed.
If these checks are positive and the program has been carried
out without interruptions or malfunctions, the load has been