35
Installation
1
2
Fig. 10 - Spray arms
1) Upper spray arm. - 2) Lower spray arm.
⇒
- After fixing the spray arms, carry out a test by manually
turning it, making sure that they rotate freely and with-
out impediments.
- After machine positioning, make sure nothing is pre-
venting the tank door from being freely opened.
- Make sure the machine is connected properly to the
electrical supply, to the water supply and to the drain
trap, then level it by adjusting its feet.
- After installation remove the PVC protection layer cov-
ering the panels, make sure the liquid tanks are full and
the suction nozzles are properly inserted into the right
tanks. A label next to the cap indicates the type of liquid
to be used for each suction tube.