Installing the Battery
1.
Place the battery in the tray.
1
2
4
3
G023659
Figure 55
2.
Install the positive (red) battery cable to the positive
(+) battery terminal, and tighten the nut onto the bolt.
Important:
The red cable may be covered by a
wire loom. The positive cable is the one with the
red boot.
3.
Install the negative (black) ground cable to the negative
(-) battery terminal, and tighten the nut onto the bolt.
4.
Slide the red terminal boot onto the positive (+) battery
post.
5.
Install the hold-down, and secure it with the wing nuts
and washers.
Checking and Cleaning the Battery
Service Interval:
Every 100 hours—Check the battery cable
connections.
Keep the top of the battery clean. If the machine is stored in
a location where temperatures are extremely high, the battery
will discharge more rapidly than if the machine is stored in
a cooler location.
Keep the top of the battery clean by washing it with a brush
dipped in ammonia or a solution of sodium bicarbonate.
Flush the top surface with water after cleaning. Do not
remove the fill cap while cleaning the battery.
The battery cables must be tight on the terminals to provide
good electrical contact.
If corrosion occurs at the battery terminals, disconnect the
cables, negative (-) cable first, and scrape the clamps and
terminals separately. Connect the cables, positive (+) cable
first, and coat the terminals with petroleum jelly.
44
Содержание Sand Pro 2040Z
Страница 58: ...Notes 58...