Note:
Ensure that the turrets for the sprayer
nozzles are facing rearward.
4.
Assemble hinge plate to the triangular plate
using 4 flange-head bolts, 4 backing plates, and
4 flange locknuts (
), that you removed
in step
.
5.
Torque the nuts bolts and nuts to 37 to 45 N∙m
(27 to 33 ft-lb).
6.
Align the rod end of the boom lift cylinder with
the holes in the horn of the pivot bracket (
g028738
Figure 41
1.
Rod end (boom lift
cylinder)
3.
Clevis pin (5/8 x 4-3/4
inches)
2.
Horn (pivot bracket)
4.
Hairpin
7.
Secure the rod end to the pivot bracket with a
clevis pin and a hairpin (
8.
Repeat step
through
on the other side of the
center-boom assembly with the opposing boom
section.
Note:
Before you finish this procedure, ensure
that all of turrets for the spray nozzles are facing
rearward.
28