4.
Assemble the rate control valve, gasket, and
agitation-valve manifold with a flange clamp and
tighten by hand (
A)
5.
Align a gasket between the flanges of the
agitation-valve manifold and the master-boom
valve (
6.
Assemble the agitation-valve manifold, gasket,
and master-boom valve with a flange clamp and
tighten by hand (
A)
7.
Assemble the outlet fitting onto the coupling
fitting at the at the bottom of the manifold for the
agitation valve (
B)
8.
Secure the outlet fitting to the coupling fitting by
inserting a retainer into the socket of the outlet
fitting (
9.
Assemble the agitation valve to the valve mount
with the flanged-head bolt and flanged locknut
(
) that you removed in step
of
Removing the Agitation Manifold Valve (page
79)
, and torque the nut and bolt to 10 to 12 N∙m
(90 to 110 in-lb).
10.
If you loosened the mounting hardware for the
master-boom valve, tighten the nut and bolt to
10 to 12 N∙m (90 to 110 in-lb).
Installing the Master Boom
Manifold Valve
1.
Align the flange of the master-boom-valve
manifold, a gasket, and the flange of the
master-boom bypass valve (
).
g033590
Figure 129
1.
Flange (agitation valve)
4.
Flange clamp
2.
Flange
(bypass—master-boom
valve)
5.
Gasket
3.
Manifold (master-boom
valve)
6.
3-pin connector (valve
actuator—master-boom
valve)
2.
Assemble the master-boom valve manifold,
gasket, and master-boom bypass valve with a
flange clamp tightened hand tight (
).
3.
Align the flange of the master-boom-valve
manifold, a gasket, and the agitation-valve
manifold (
).
4.
Assemble the master-boom-valve manifold,
gasket, and agitation-valve manifold with a
flange clamp and tighten by hand (
5.
Align the socket of the 90° outlet fitting onto
the coupling fitting at the at the bottom of the
manifold for the master-boom valve (
86