third hole from the bottom in the boom supports
on the spray skid frame, as shown in
.
Note:
If necessary, loosen the boom supports
and adjusted them to the center boom section
for better hole alignment. Torque the bolts and
nuts to 67 to 83 N∙m (91 to 113 ft-lb).
g028460
Figure 39
1.
Locknut (1/2 inch)
4.
Section mounting bracket
(right)
2.
Hole 3—from the bottom
(boom support)
5.
Bolt (1/2 x 1-1/4 inches)
3.
Section mounting bracket
(left)
3.
Assemble the center boom assembly to the
spray skid frame with 4 bolts (1/2 x 1-1/4 inches)
and 4 locknuts (1/2 inch).
4.
Torque the bolts and nuts to 67 to 83 N∙m (91
to 113 ft-lb).
Connecting the Hoses and Wiring
for the Boom Lift Valve
•
For HD-Series Models with a Manual Transmission,
refer to the installation instructions for the Multi Pro
WM Turf Sprayer Finishing Kit, Manual Workman
Utility Vehicle.
•
For HDX-Auto Model, refer to the installation
instructions for the Multi Pro WM Turf Sprayer
Finishing Kit, Automatic Workman Utility Vehicle.
15
Installing the Left and Right
Boom Section
Parts needed for this procedure:
1
Left boom section
1
Right boom section
8
Flange-head bolts (3/8 x 1-1/4 inches)
8
Backing plates
8
Flange locknuts (3/8 inch)
2
Clevis pin
2
Hairpin
Procedure
Each boom section weighs approximately 14 kg (30
lb).
1.
Remove the 4 flange-head bolts (3/8 x 1-1/4
inches), 4 backing plates, and 4 flange locknuts
(3/8 inch) from the hinge bracket of the
center-boom section.
2.
Rotate each pivot bracket at the end of the
center boom section so that the brackets align
vertically (
).
g028737
Figure 40
1.
Center boom section
5.
Triangular mounting plate
2.
Boom extension
6.
Backing plates
3.
Hinge plate
7.
Flange locknuts (3/8 inch)
4.
Flange-head bolts (3/8 x
1-1/4 inches)
3.
Lift the outer boom section and align holes in the
triangular mounting plate at the end of the outer
boom section with the holes in the pivot bracket.
27