7
Maintenance and Service
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Page 183
8)
Disconnect the PEEK capillary going from the probe to the grounding
union as shown in Figure 97.
Figure 97: Disconnecting PEEK capillary connection of source at grounding union
9)
Locate the black plastic knob of the APCI probe assembly and slowly
turn counter-clockwise to remove from the source spray chamber
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...