5
Installation
Page 108
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
the external cover on the left side of the instrument (if facing the
instrument). Next, remove the lock screw located on the outside of the left
side panel (if facing the instrument), directly opposite of the inlet. Once the
retaining screw is removed, the inlet assembly can be freely moved to the
other set of two holes. The inlet has a tapped hole and a pin to position it
and can be conveniently positioned as required for the application as shown
in Figure 55.
Figure 55: LC to MS inlet assembly
5.5.9
Flushing the Calibration Solution
This section provides instructions for flushing the calibration solution. The
instrument must be completely connected and running before calibrant
solution can be flushed.
1)
In the Detector-More Options box, toggle the valve position to Load
using the dropdown menu. See Figure 56.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...