5
Installation
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Page 115
5.7
Powering Up the System
The power switch is located at the rear of the instrument’s top right corner
as shown in Figure 60 below. The instrument will power on when the switch
is in the up-right position as shown. The MS instrument will automatically
switch between 110V and 230V. There is no manual adjustment required.
Figure 60: Location of power switch
Check the foreline pump voltage setting as indicated in Figure 61. The
voltage must match that of the supplied voltage to the MS instrument. For
example, if the MS instrument is using 110V, it is important that the foreline
pump voltage is also set to 110V.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...