6
Operation
Page 158
ISQ EC and ISQ EM Mass Spectrometer Operating Manual
Figure 85: Smart Standby Parameters
6.7.2
Long-Term Shutdown
Use the information in this section to prepare the system for high-level
maintenance and repair
.
Powering Off the Instrument
TIP Shutting down the mass spectrometer affects the operation of the
system. When shutting down the MS, also observe the shutdown
instructions for the other system modules and take appropriate action (refer
to the Operating Manuals for the modules).
To power off, follow the instructions below.
1)
Flush the system with an appropriate, pure solvent (minimum LC/MS-
grade) that does not contain any salts. Make sure that residual sample
components, impurities from the column, or buffers are completely
removed from the detector.
2)
Cool down the vaporizer.
Содержание ISQ EC
Страница 1: ...ISQ EC and ISQ EM Mass Spectrometer Operating Manual 1R120591 0002 Revision E February 2019 ...
Страница 4: ...Page 4 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 66: ...5 Installation Page 66 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 135: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 135 ...
Страница 163: ...6 Operation ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 163 Figure 90 Venting the mass spectrometer ...
Страница 166: ...6 Operation Page 166 ISQ EC and ISQ EM Mass Spectrometer Operating Manual MS LC IC Start port Integrion RLY port ...
Страница 204: ...7 Maintenance and Service Page 204 ISQ EC and ISQ EM Mass Spectrometer Operating Manual ...
Страница 228: ...12 Index Page 228 ISQ EC and ISQ EM Mass Spectrometer Operating Manual 12 Index ...
Страница 229: ...12 Index ISQ EC and ISQ EM Mass Spectrometer Operating Manual Page 229 ...
Страница 232: ...Thermo Fisher Scientific Inc 168 Third Avenue Waltham Massachusetts 02451 USA www thermofisher com ...