Chapter 7
Column
Installation
138
8. Tighten the M4 retaining nut using the 6 mm wrench. Use no more pressure
than is necessary to achieve a good seal (1/4 to 1/2 turn).
OPERATING SEQUENCE
How to Connect a Packed Column
To install the packed column, the following sequential steps should be performed:
•
Preparing a Metal Packed Column
•
Connecting a Packed Column to a PPKD Injector
•
Connecting a Packed Column to the S/SL Injector
•
Connecting a Packed Column to the TCD Detector
Preparing a Metal Packed Column
Before you begin, verify that the proper adapters are installed on the injector and
detector side.
Slide the fittings onto the packed column injector and detector ends in the order
and direction shown in Figure 7-5.
Figure 7-5. Metal Packed Column Fittings
1. Front Ferrule
3. Retaining Nut
2. Back Ferrule
4. Packed Column
Содержание FOCUS GC
Страница 1: ...Thermo Scientific FOCUS GC Gas Chromatograph Instruction Manual PN 31709412 Revision May 2007 HOME ...
Страница 4: ...iv InstructionManual ...
Страница 70: ...Chapter 2 The FOCUS GC User Interface Info Diagnostics 70 Instruction Manual ...
Страница 92: ...Chapter 4 Column Oven Oven Parameters 92 Instruction Manual ...
Страница 124: ...Chapter 6 Purged Packed Column Injector PPKD PPKD Injector Menu 124 Instruction Manual ...
Страница 170: ...Chapter 8 Flame Ionization Detector FID Detector Signal Parameters 170 Instruction Manual ...
Страница 186: ...Chapter 9 Thermal Conductivity Detector TCD Detector Signal Parameters 186 Instruction Manual ...
Страница 242: ...Chapter 13 SOP number P0473 04 E 02 May 2007 242 Instruction Manual ...
Страница 320: ...Chapter 15 Maintenance and Troubleshooting Guide to Solve Analytical Problems 320 Instruction Manual ...
Страница 336: ...Chapter 16 LAN Option Set up Set Up 336 Instruction Manual ...
Страница 344: ...Glossary 344 Instruction Manual C min 1 instead of C min g L 1 instead of g L ...
Страница 350: ...Index 350 Instruction Manual ...