![Thermo Scientific 42iQD Скачать руководство пользователя страница 40](http://html.mh-extra.com/html/thermo-scientific/42iqd/42iqd_instruction-manual_1105143040.webp)
Operation
Calibration
3-16
42iQD Instruction Manual
Thermo Scientific
The Zero/Span Schedule is used to program the instrument to perform
fully automated zero and span checks or adjustments.
Home Screen>Calibration>Zero/Span Schedule
Home Screen>Calibration>Zero/Span Schedule>More
The Zero/Span Schedule contains the following information:
●
Zero/Span Schedule:
Toggles zero/span schedule Enabled or Disabled.
●
Next Time:
Allows the user to view and set the initial date and time
(24-hour format) of the zero/span schedule.
●
Period:
Defines the period or interval between zero/span checks or
calibrations. If period = 0, the schedule runs continuously.
●
Zero Duration:
Sets how long zero air is sampled by the instrument.
●
Span Duration:
Sets how long span gas is sampled by the instrument.
●
Purge Duration:
Sets how long the purge period will be at the end of
the schedule.
●
Total Duration:
Read only. Displays the total time duration of all
scheduled events.
Zero/Span Schedule
Содержание 42iQD
Страница 1: ...42iQD Instruction Manual NOx Analyzer 119013 00 1Sep2021 ...
Страница 2: ......
Страница 32: ...Operation Instrument Display 3 8 42iQD Instruction Manual Thermo Scientific ...
Страница 182: ...Maintenance Pump Rebuilding 5 8 42iQD Instruction Manual Thermo Scientific Figure 5 3 Pump Rebuilding ...
Страница 184: ......
Страница 198: ...Servicing Fan Replacement 7 8 42iQD Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 212: ...Servicing Power Supply Replacement 7 22 42iQD Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 235: ...Servicing DMC Ozonator Thermo Scientific 42iQD Instruction Manual 7 45 Figure 7 49 Flow Switch Remove ...
Страница 238: ......
Страница 272: ......
Страница 284: ......
Страница 285: ......