Servicing
DMC PMT Cooler and Reaction Chamber Replacement
Thermo Scientific
42iQD Instruction Manual
7-31
Figure 7–35.
Photo Reaction Chamber Cleaning, Hardware
6.
Pull reaction chamber outwards.
Equipment Damage
Some internal components can be damaged by small
amounts of static electricity. A properly grounded antistatic wrist strap
must be worn while handling an internal component.
▲
7.
To reinstall reaction chamber, follow previous steps in reverse, making
sure to back fill the cooler with dry air or nitrogen prior to installing
reaction chamber.
8.
Reinstall the measurement bench. Refer to
Содержание 42iQD
Страница 1: ...42iQD Instruction Manual NOx Analyzer 119013 00 1Sep2021 ...
Страница 2: ......
Страница 32: ...Operation Instrument Display 3 8 42iQD Instruction Manual Thermo Scientific ...
Страница 182: ...Maintenance Pump Rebuilding 5 8 42iQD Instruction Manual Thermo Scientific Figure 5 3 Pump Rebuilding ...
Страница 184: ......
Страница 198: ...Servicing Fan Replacement 7 8 42iQD Instruction Manual Thermo Scientific Figure 7 8 Replacing the Fan ...
Страница 212: ...Servicing Power Supply Replacement 7 22 42iQD Instruction Manual Thermo Scientific Figure 7 26 Replacing Power Supply ...
Страница 235: ...Servicing DMC Ozonator Thermo Scientific 42iQD Instruction Manual 7 45 Figure 7 49 Flow Switch Remove ...
Страница 238: ......
Страница 272: ......
Страница 284: ......
Страница 285: ......