4
I. Pre-Installation........................................... 8
II. Unpacking the Boiler ................................ 9
III. Installation ................................................10
A. Venting ................................................10
B. Combustion Air .................................15
C. Water Treatment ................................17
D. Water Piping and Trim ......................18
E. Gas Piping ...........................................21
F. Electrical .............................................24
G. Modular Systems ................................31
H. Condensate Drains ............................40
IV. System Start-up ........................................41
V. Lighting Instructions ...............................44
VI. Boiler Operational Sequence ..................46
VII. Service/Maintenance ...............................48
Minimum Clearance to Combustible Materials
Left Side
Right Side
Front
Rear
Top
Flue Connector
6"
6"
24"
6"
6"
18"
Recommended Clearance for Service
Boiler Size
Left Side
or
Right Side
Front and Rear Top
750/1000
24"
24"
24"
24"
16"
1500
24"
24"
24"
24"
19"
2000
24"
24"
24"
24"
31"
3000
24"
24"
36"
36"
26.5"
NOTES:
1.
When 3 or more units are mounted side-by-side, the front service clearance
increases by 12" and the rear service clearance increases by 24".
2.
Verify clearances with local codes.
Table of Contents
A. Safety and Operating Controls.........49
B. Troubleshooting .................................50
C. Periodic Maintenance........................52
D. Inspection & Cleaning Procedure ...53
VIII. Repair Parts .............................................56
IX. Thermal Solutions Boiler Control™
(TSBC™)
...................................................85
A. Introduction .......................................85
B. Front Panel Display ...........................86
C. Security Menu ....................................88
D. Setup Menu .........................................89
E. Boiler Configuration Menu...............92
F. System Configuration Menu .............93
G. Setpoints Menu ..................................94
H. Communication Menu .....................95
I. Manual Mode Menu ...........................96
X. Warranty ...................................Back Cover
3.
Net AHRI Ratings
A.
The Net AHRI Water Ratings shown are based on a piping and pickup allowance of 1.15.
B.
The manufacturer should be consulted before selecting a boiler for installations having unusual piping and
pickup requirements, such as intermittent system operation, extensive piping systems, etc.
C.
The ratings have been determined under the provisions governing forced draft boiler-burner units.
Содержание EVCA SERIES
Страница 13: ...13 Figure 3 Typical Sidewall Pressurized Venting Optional Figure 2 Typical Sidewall Pressurized Venting ...
Страница 14: ...14 Figure 4 Typical Vertical Pressurized Venting ...
Страница 16: ...16 Figure 6 Vertical Air Intake Piping Figure 5 Horizontal Air Intake Piping ...
Страница 19: ...19 Figure 8 Schematic Boiler Piping ...
Страница 25: ...25 Figure 9a 208 230 480V 1PH 3PH 60HZ Supply Power Wiring Schematic ...
Страница 26: ...26 Figure 9b 120V 1PH 60HZ Supply Power Wiring Schematic ...
Страница 27: ...27 Figure 9c Control Wiring Schematic EVCA 750 2000 ...
Страница 29: ...29 Figure 9e Control Wiring Schematic EVCA 3000 ...
Страница 32: ...32 Figure 10 Modular System Horizontal Air Intake Piping ...
Страница 33: ...33 Figure 11 Modular System Vertical Air Intake Piping ...
Страница 34: ...34 Figure 12 Modular System Typical One Pipe Water Piping ...
Страница 35: ...35 Figure 13 Modular System Typical Primary Secondary Water Piping ...
Страница 36: ...36 Figure 14 Modular System Typical Primary Secondary without System Pump ...
Страница 37: ...37 Figure 15 Modular System Typical Reverse Return Water Piping ...
Страница 38: ...38 Figure 16 Modular System Reverse Return with System Pump Only ...
Страница 39: ...39 Figure 17 Modular System Typical Primary Secondary with Reverse Return ...
Страница 55: ...55 Figure 18 Cleaning Secondary Heat Exchanger 1 2 ...
Страница 56: ...56 This page intentionally left blank ...
Страница 58: ...58 Figure 19 Boiler Combustion Chamber ...
Страница 60: ...60 Figure 20 Burner Assembly FRONT VIEW TOP VIEW ...
Страница 62: ...62 Figure 21a UL FM CSD 1 Main Gas Train Assembly EVCA 750 2000 ...
Страница 64: ...64 Figure 21b UL FM CSD 1 Main Gas Train Assembly EVCA 3000 ...
Страница 66: ...66 Figure 22a DB B Gas Train 750 Figure 22b DB B Gas Train 1000 2000 ...
Страница 68: ...68 Figure 22c DB B w POC Gas Train 750 Figure 22d DB B w POC Gas Train 1000 2000 ...
Страница 70: ...70 Figure 22e DB B Gas Train EVCA 3000 Figure 22f DB B w POC Gas Train EVCA 3000 ...
Страница 72: ...72 Figure 23 Jacket ...
Страница 74: ...74 Figure 24 EVCA 750 1000 and 1500 Secondary Heat Exchanger and Housing ...
Страница 78: ...78 Figure 25b EVCA 3000 Secondary Heat Exchanger and Housing ...
Страница 80: ...80 Figure 26 Control Panel Assembly ...
Страница 82: ...82 Figure 27 Bishop Pilot Assembly ...
Страница 97: ...97 NOTES ...
Страница 98: ...98 NOTES ...
Страница 99: ...99 NOTES ...