18
D.
WATER PIPING AND TRIM
1. Design and install boiler and system piping to
prevent oxygen contamination of boiler water
and frequent water additions.
a. There are many possible causes of oxygen
contamination such as:
i
. Addition of excessive make-up water
as a result of system leaks.
ii
. Absorption through open tanks and fittings.
iii
. Oxygen permeable materials in the
distribution system.
b. In order to insure long product life, oxygen
sources must be eliminated. This can be
accomplished by taking the following measures:
i
. Repairing system leaks to eliminate the need
for addition of make-up water.
ii
. Eliminating and/or repairing fittings which
allow oxygen absorption.
iii
. Using of non-permeable materials in the
distribution system.
iv
. Isolating the boiler from the system water by
installing a heat exchanger.
v
. Using properly designed and operating air
elimination devices in water piping.
2. Connect system supply and return piping to boiler.
a. Refer to Figure 8.
b. Consult I=B=R Installation and Piping Guides.
c. Maintain ½" minimum distance between water
piping and combustible material.
d. Consult Thermal Solutions for unusual system
requirements.
3. Remove protective cap from boiler drain line located
in the rear of the boiler (EVCA-750 through 2000)
or the right side of the boiler (EVCA-3000).
4. For EVCA-3000, install a 10" minimum or longer 1"
diameter nipple into hole in right side of base and
thread into drain elbow underneath the boiler.
5. Install drain valve in the boiler drain line at bottom
rear or right side of the boiler.
6. If this boiler is used in connection with refrigeration
systems, the boiler must be installed so that the
chilled medium is piped in parallel with the boiler
using appropriate valves to prevent the chilled
medium from entering the boiler. Also consult
I=B=R Installation and Piping Guides. If this boiler
is connected to heating coils located in air handling
units where they may be exposed to refrigerated air,
the boiler piping must be equipped with flow control
valves to prevent gravity circulation of boiler water
during operation of the cooling system.
7. Install optional low water cut-off in system piping
above the boiler, if not shipped with boiler. On
EVCA-750 through -2000 boilers, a low water cut-
off may be installed on the boiler at the factory as
an option. A factory-mounted low water cut-off is
standard on all EVCA-3000 boilers.
8. Install an air eliminating device to remove air from
the system.
WARNING
For EVCA 750-2000, the boiler air vent is shipped
loose. Prior to connecting system piping to
boiler, or filling the boiler with water, remove
protective cap from the tagged elbow at the top
of the loop piping. Install supplied air vent to
boiler elbow using teflon tape.
CAUTION
Support weight of system piping adequately.
Boiler loop piping is not designed to support
system piping weight.
CAUTION
Failure to properly pipe boiler may result in
improper operation and damage to boiler or
structure.
All piping, either new or existing, must be
cleaned with a tri sodium (TSP) solution to
remove mill scale and oils from the system.
Failure to do so could result in premature failure
of the heat exchanger (not covered by Thermal
Solutions warranty.
On an existing or retrofit system, a filter or
strainer must be installed on the system return
prior to the boilers.
When using Glycol products, all Glycol
manufacturers' requirements, including rust
inhibitors, must be adhered.
Содержание EVCA SERIES
Страница 13: ...13 Figure 3 Typical Sidewall Pressurized Venting Optional Figure 2 Typical Sidewall Pressurized Venting ...
Страница 14: ...14 Figure 4 Typical Vertical Pressurized Venting ...
Страница 16: ...16 Figure 6 Vertical Air Intake Piping Figure 5 Horizontal Air Intake Piping ...
Страница 19: ...19 Figure 8 Schematic Boiler Piping ...
Страница 25: ...25 Figure 9a 208 230 480V 1PH 3PH 60HZ Supply Power Wiring Schematic ...
Страница 26: ...26 Figure 9b 120V 1PH 60HZ Supply Power Wiring Schematic ...
Страница 27: ...27 Figure 9c Control Wiring Schematic EVCA 750 2000 ...
Страница 29: ...29 Figure 9e Control Wiring Schematic EVCA 3000 ...
Страница 32: ...32 Figure 10 Modular System Horizontal Air Intake Piping ...
Страница 33: ...33 Figure 11 Modular System Vertical Air Intake Piping ...
Страница 34: ...34 Figure 12 Modular System Typical One Pipe Water Piping ...
Страница 35: ...35 Figure 13 Modular System Typical Primary Secondary Water Piping ...
Страница 36: ...36 Figure 14 Modular System Typical Primary Secondary without System Pump ...
Страница 37: ...37 Figure 15 Modular System Typical Reverse Return Water Piping ...
Страница 38: ...38 Figure 16 Modular System Reverse Return with System Pump Only ...
Страница 39: ...39 Figure 17 Modular System Typical Primary Secondary with Reverse Return ...
Страница 55: ...55 Figure 18 Cleaning Secondary Heat Exchanger 1 2 ...
Страница 56: ...56 This page intentionally left blank ...
Страница 58: ...58 Figure 19 Boiler Combustion Chamber ...
Страница 60: ...60 Figure 20 Burner Assembly FRONT VIEW TOP VIEW ...
Страница 62: ...62 Figure 21a UL FM CSD 1 Main Gas Train Assembly EVCA 750 2000 ...
Страница 64: ...64 Figure 21b UL FM CSD 1 Main Gas Train Assembly EVCA 3000 ...
Страница 66: ...66 Figure 22a DB B Gas Train 750 Figure 22b DB B Gas Train 1000 2000 ...
Страница 68: ...68 Figure 22c DB B w POC Gas Train 750 Figure 22d DB B w POC Gas Train 1000 2000 ...
Страница 70: ...70 Figure 22e DB B Gas Train EVCA 3000 Figure 22f DB B w POC Gas Train EVCA 3000 ...
Страница 72: ...72 Figure 23 Jacket ...
Страница 74: ...74 Figure 24 EVCA 750 1000 and 1500 Secondary Heat Exchanger and Housing ...
Страница 78: ...78 Figure 25b EVCA 3000 Secondary Heat Exchanger and Housing ...
Страница 80: ...80 Figure 26 Control Panel Assembly ...
Страница 82: ...82 Figure 27 Bishop Pilot Assembly ...
Страница 97: ...97 NOTES ...
Страница 98: ...98 NOTES ...
Страница 99: ...99 NOTES ...