3-65537
92GR MM188 (11---87)
RECOMMENDED FIRST 50---HOUR MACHINE INSPECTION
After the first 50 hours of operation, the following
procedures are recommended:
1. Check the brush pattern for correct brush
adjustment.
2. Change the hydraulic fluid filter.
3. Check the torque of the engine cylinder head
cap screws.
4. Perform all 50---hour interval lubrication and
maintenance procedures listed in the
Maintenance chart.
5. Check the valve tappet clearance after the first
250 hours of operation.
Содержание 92 GR
Страница 1: ...Operator Manual...
Страница 10: ...SECTION 1 SPECIFICATIONS CONTENTS Page Machine Specifications 1 1 Machine Dimensions 1 3...
Страница 14: ...92GR MM188 6 87 1 4...
Страница 33: ...92GR MM188 10 87 2 18...
Страница 44: ...3 65545 92GR MM188 11 87 04307 HYDRAULIC SCHEMATIC...
Страница 56: ...3 65557 92GR MM188 11 87 04309 ELECTRICAL SCHEMATIC...
Страница 57: ...92GR MM188 11 87 3 65558 01502 ELECTRICAL SCHEMATIC ACCESSORIES...