![TEC BlowerDoor Standard Скачать руководство пользователя страница 24](http://html1.mh-extra.com/html/tec/blowerdoor-standard/blowerdoor-standard_manual_4022808024.webp)
24
January 2022
BlowerDoor Standard
Installation steps:
Fig. 2.24
•
Turn on the DG-1000 pressure gauge by pressing
and holding the power button for approx. 3
seconds until the green power indicator light
turns on, and wait until the DG-1000 is booted.
The bootup process may take some seconds to
complete, and the gauge is ready to be used
when the home screen appears (shown below).
Fig. 2.25
•
To enable Ethernet connection touch “Settings”
on the home screen.
Fig. 2.26
•
Select “Network Configuration”.