5 Computer-Controlled Tests with TECTITE Express
50
January 2022
BlowerDoor Standard
Fig. 5.7
Building test information
window
Enter all data relevant to
the test in this window:
dates, tester, customer,
building address and
building data.
Fig. 5.8
Comments window
This window is for
additional notes such as
placement of the
BlowerDoor Measurement
System, temporary seals,
building condition at the
time of the test, and large
leaks.