3
WY05-0740E
Y-2
Y-2
Air Bleeding Procedure
2. Accelerator circuit
1
. Bleed the accelerator circuit by depressing the
accelerator pedal in the crane operator’s cab
repeatedly with the carrier engine stopped. (there
are three bleeding points.)
2. After bleeding, check that the oil level in the
reserve tank in the cab is between the marks
indicating the allowable lowest and highest levels.
3. After bleeding, depress the accelerator pedal
gradually and make sure that the engine functions
smoothly at all engine speeds from idling to
maximum speed. If not, repeat bleeding and
accelerator adjustment.
Engine speed:
Maximum [
1
950-2000 min
-
1
(rpm)]
Operation ass'y, accelerator (on the carrier frame)
AC2 Bleeding plug
Bleeding plug
Top view of rotary joint
AC
1
Bleeding plug
IWY05-0740E02
3. Swing circuit
3.
1
Swing motor
Bleed the swing motor by following either (
1
), (2) or
(3).
(
1
) Pour the hydraulic oil through the drain port into
the casing until the oil flows out.
(2) Perform the right or left swing operation slowly
for approx. one minute.
(3) Set the swing brake switch to ON. Perform the
right or left swing operation and keep the swing
circuit hydraulic pressure at approx. 4.9MPa (7
1
0
psi) for approx. 30 seconds.
(TR-600)
(TR-800)
Drain port
IWY05-0580E06
3.2 Swing hydraulic pilot control valve
Set the PTO switch and the swing brake switch to
ON, and set the engine speed to the maximum
(2
1
50 min
-
1
). Repeat the rapid swing operation to the
right or the left until no more air bubbles come out of
the air bleeder screw.
Содержание TT-800XXL1
Страница 20: ...B 2 B 2 Hydraulic Pump 3 W101 0280E 1 2 Inside view Variable displacement piston pump...
Страница 25: ...8 W101 0280E B 2 B 2 Hydraulic Pump 1 Joint control piston 2 Hanger 3 Metal 4 Orifice Hanger section 6 7...
Страница 114: ...5 G 2 G 2 Boom Five Section Boom 5 W536 0760E G 2...
Страница 166: ...13 13 W701 0160E K 2 K 2 Air Conditioner K 2 4 Layout 4 1 Overall layout...
Страница 167: ...14 14 W701 0160E K 2 K 2 Air Conditioner K 2 4 2 Overall layout...
Страница 168: ...15 15 W701 0160E K 2 K 2 Air Conditioner K 2 4 3 Evaporator section...
Страница 169: ...16 W701 0160E K 2 K 2 Air Conditioner 5 Compressor ass y...
Страница 170: ...17 17 W701 0160E K 2 K 2 Air Conditioner K 2 6 Evaporator ass y...
Страница 171: ...18 18 W701 0160E K 2 K 2 Air Conditioner K 2 7 Condenser ass y...
Страница 172: ...19 19 W701 0160E K 2 K 2 Air Conditioner K 2 8 Electric 8 1 Electric circuit 0 363 205 60030...
Страница 173: ...20 20 W701 0160E K 2 K 2 Air Conditioner K 2 8 2 Main harness A...
Страница 174: ...21 21 W701 0160E K 2 K 2 Air Conditioner K 2 8 3 Main harness B...
Страница 227: ...Hydraulic Pressure Setting Table 1 WY02 0320E 1 Y 1 Y 1 Y 1 Hydraulic Pressure Setting Table 1 345 801 01500...
Страница 254: ...Location of Hydraulic Parts 4 WZ07 0780E 4 Z 4 Z 4 Z 4 Location of Hydraulic Parts...
Страница 259: ...Hydraulic Electric Carrier Equipment Comparison Table Z 8 Z 8 Z 8 9 WZ09 0130E 9...
Страница 262: ...Z 11 Z 11 Harness Swing Table Right Z 11 11 WZ04 1300E 11 Harness Swing Table Right 5 343 530 32010...
Страница 263: ...Z 12 Z 12 Harness Boom Z 12 12 WZ04 1310E 12 Harness Boom 1 2 2 343 530 32040 1 343 530 22030...
Страница 265: ...14 WZ04 1320E 14 Z 14 Z 14 Harness Lower Z 14 Harness Lower Applicable serial No 475334 1 1 336 500 30021...
Страница 266: ...Z 15 Z 15 Harness Outrigger Operation Option Z 15 15 WZ04 1330E 15 Harness Outrigger Operation Option 0 333 316 60020...