K-2
K-2
Air Conditioner
25
W701-0160E
Flow
No.
Procedure Safety
point
Jigs and
tools
1
Plug the power supply cord of the main unit.
2
Connect the coupler of the high-pressure side (red hose) and the
low-pressure side with the compressor main body sequentially.
Purge residual pressure before connecting because the
connection of coupler becomes firm if there is residual pressure in
the unit.
(Usually it has been performed at work end. Refer to Flow No.14.)
Be careful to the
scaffold
3
Attach all freon cans. (6 cans)
Tighten as it is though the gas leaks a little when attaching.
Be careful that gas
liquor does not splash
4
Turn ON the automatic gas sweep switch. (to increase degree of
vacuum)
(If the gas is insufficient, turning OFF is allowed.)
5
Set the time switch to "20 minutes".
(Set to longer period if there is a time.)
6
Turn the power switch to the automatic side. (starts vacuum)
7
Vacuum operation is finished when the buzzer sounds 15-20
minutes later. Starts gas charging.
8
Engine start is allowed when buzzer sound stops. (Turn ON the air
conditioner switch.)
(Keep idling for at least 10 minutes --- specified by DENSO.)
Make sure to check
surroundings
9
Turn OFF the power switch when the gas disappears from the
remainder gas sight glass of the main unit.
10
Check the air-conditioning capability
Temperature control: : Maximum cool
Blower: : Hi
Engine speed : Approx. 2000 rpm
The blowing temperature must be in the graphic chart value.
(Refer to the graphic chart.)
(Near the outside air temperature scale in the gauge is a standard
pressure.)
11
Stop the engine
Pull out the key
12
Wait for two minutes until pressure falls, and detach the
high-pressure side and low-pressure side quick couplers.
Be careful to the
scaffold
13
Test gas leakage. (for all hose connections)
(Check the gas leakage from the lower side because the freon is
heavier than air.)
Compressor: 2 places
Compressor charge coupler: 2 places
Receiver: 2 places
Condenser Assy: 2 places
Main body of air conditioner: 2 places
Pressure switch hose connections : 1 place
11 places in total
Be careful to the
scaffold
Gas
leak
tester
14
Detach the empty gas can, and purge pressure in the hose.
1) Set the timer knob to the vacuum side.
2) Set the power switch to the automatic or manual.
3) Turn OFF the power switch when the high/low-pressure gauge
indicates approx. "0" pressure-value after a few seconds.
15
Finish the work.
Unplug the power supply cord, and put away the gas charge unit.
Содержание TT-800XXL1
Страница 20: ...B 2 B 2 Hydraulic Pump 3 W101 0280E 1 2 Inside view Variable displacement piston pump...
Страница 25: ...8 W101 0280E B 2 B 2 Hydraulic Pump 1 Joint control piston 2 Hanger 3 Metal 4 Orifice Hanger section 6 7...
Страница 114: ...5 G 2 G 2 Boom Five Section Boom 5 W536 0760E G 2...
Страница 166: ...13 13 W701 0160E K 2 K 2 Air Conditioner K 2 4 Layout 4 1 Overall layout...
Страница 167: ...14 14 W701 0160E K 2 K 2 Air Conditioner K 2 4 2 Overall layout...
Страница 168: ...15 15 W701 0160E K 2 K 2 Air Conditioner K 2 4 3 Evaporator section...
Страница 169: ...16 W701 0160E K 2 K 2 Air Conditioner 5 Compressor ass y...
Страница 170: ...17 17 W701 0160E K 2 K 2 Air Conditioner K 2 6 Evaporator ass y...
Страница 171: ...18 18 W701 0160E K 2 K 2 Air Conditioner K 2 7 Condenser ass y...
Страница 172: ...19 19 W701 0160E K 2 K 2 Air Conditioner K 2 8 Electric 8 1 Electric circuit 0 363 205 60030...
Страница 173: ...20 20 W701 0160E K 2 K 2 Air Conditioner K 2 8 2 Main harness A...
Страница 174: ...21 21 W701 0160E K 2 K 2 Air Conditioner K 2 8 3 Main harness B...
Страница 227: ...Hydraulic Pressure Setting Table 1 WY02 0320E 1 Y 1 Y 1 Y 1 Hydraulic Pressure Setting Table 1 345 801 01500...
Страница 254: ...Location of Hydraulic Parts 4 WZ07 0780E 4 Z 4 Z 4 Z 4 Location of Hydraulic Parts...
Страница 259: ...Hydraulic Electric Carrier Equipment Comparison Table Z 8 Z 8 Z 8 9 WZ09 0130E 9...
Страница 262: ...Z 11 Z 11 Harness Swing Table Right Z 11 11 WZ04 1300E 11 Harness Swing Table Right 5 343 530 32010...
Страница 263: ...Z 12 Z 12 Harness Boom Z 12 12 WZ04 1310E 12 Harness Boom 1 2 2 343 530 32040 1 343 530 22030...
Страница 265: ...14 WZ04 1320E 14 Z 14 Z 14 Harness Lower Z 14 Harness Lower Applicable serial No 475334 1 1 336 500 30021...
Страница 266: ...Z 15 Z 15 Harness Outrigger Operation Option Z 15 15 WZ04 1330E 15 Harness Outrigger Operation Option 0 333 316 60020...