D 59
D
D_DF1
1
5_135C_
G
B
.f
m
. 59-
92 -
02-
01.
0
3
Checklist for the machine operator
Check!
How?
Emergency stop button
-
on the operating panel
-
on both remote control units
&
Push in the button.
The diesel engine and all running drives
must stop immediately.
Steering
The paver finisher must immediately fol-
low every steering wheel movement in a
precise manner. Check straight running.
Horn
-
on the operating panel
-
on both remote control units
&
Briefly press the horn button.
The horn must sound.
Lights
Switch on with the ignition key, walk
around the paver finisher to check and
switch off again.
Hazard warning lights of the screed
(with vario screeds)
With the ignition switched on, press the
switches for extending/retracting the
screed parts.
The rear lights must flash.
Gas heater system:
-
Bottle holders
-
Bottle valves
-
Pressure reducer
-
Hose break safety devices
-
Shut-off valves
-
Main shut-off valve
-
Connections
-
Indicator lamps of the switch box
Check:
-
Secure seat
-
Cleanliness and tightness
-
Working pressure 1.5 bar
-
Function
-
Function
-
Function
-
Tightness
-
All lamps must light up when the
system is switched on
Содержание DF 115 C
Страница 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 12: ......
Страница 40: ......
Страница 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 85: ...D 45 D D_DF115_135C_GB fm 45 92 02 01 03 2 5 Remote control 63 55 59 60 54 SPSRemote Tif 61 56 58 65 64 62 57...
Страница 132: ......
Страница 136: ...E 4 E DF 115 135C GB 4 6 02 01 03 2 5 Mounting extensions 16 5 9 10 8 7 6 5 14 12 11 15 12 Sch_ver1 tif Sch_ver2 tif...
Страница 178: ......