
F 4
F
F
_
DF1
15_13
5C_G
B.
fm
. 4-
40 -
02-
01.
03
2.2
First maintenance (100 operating hours)
Item
Maintenance point
Maintenance work
1.1
Pump distribution gear
Change oil
1.9
Hoses and screw connections
Visual inspections
2.2
Hydraulic tank
Change main filter
2.4
High pressure filter
Change main filter
3.1
Track groups
Check tension
3.2
Conveyor drive transmission
Change oil
4.1
Conveyor chain
Check tension
4.4
Planetary gear
Augers
Change oil
4.5
Drive chains of conveyor
augers
Check tension
4.6
Auger box
Check oil level
5.4
Movable parts
Lubrication
1.1
4.4
2.1
2.4
3.1
3.2
4.1
4.5
4.6
4.7
4.2
1.4
4.3
5.2
1.5
1.6
1.7
2.2
1.8
1.10
3.3
1.9
1.3 1.2
2.3
Содержание DF 115 C
Страница 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 12: ......
Страница 40: ......
Страница 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 85: ...D 45 D D_DF115_135C_GB fm 45 92 02 01 03 2 5 Remote control 63 55 59 60 54 SPSRemote Tif 61 56 58 65 64 62 57...
Страница 132: ......
Страница 136: ...E 4 E DF 115 135C GB 4 6 02 01 03 2 5 Mounting extensions 16 5 9 10 8 7 6 5 14 12 11 15 12 Sch_ver1 tif Sch_ver2 tif...
Страница 178: ......