F 24
F
F
_
DF1
15_13
5C_G
B.
fm
. 24-
40 -
02-
01.
03
Track group (3.1)
Only carry out maintenance work on the track group with the engine switched off.
- Unscrew screws (1).
- Remove cover (2).
- Screw head piece for flat nipple (tool box) to the grease gun.
- Inject grease into the chain tensioner with the grease gun until the grease starts to
discharge from the pressure control valve.
- Refit cover.
Spannket.tif
2
1
Содержание DF 115 C
Страница 1: ...Operating instructions 02 01 03 Road Finisher 900 98 06 40 DF 115 C DF 135 C...
Страница 2: ......
Страница 4: ......
Страница 10: ......
Страница 12: ......
Страница 40: ......
Страница 44: ...D 4 D D_DF115_135C_GB fm 4 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 46: ...D 6 D D_DF115_135C_GB fm 6 92 02 01 03 Element2_KC cdr 9 8 12 A 9 A 5 6 7 11 10...
Страница 85: ...D 45 D D_DF115_135C_GB fm 45 92 02 01 03 2 5 Remote control 63 55 59 60 54 SPSRemote Tif 61 56 58 65 64 62 57...
Страница 132: ......
Страница 136: ...E 4 E DF 115 135C GB 4 6 02 01 03 2 5 Mounting extensions 16 5 9 10 8 7 6 5 14 12 11 15 12 Sch_ver1 tif Sch_ver2 tif...
Страница 178: ......