
Section 02 ENGINE
Subsection 06 (E-RAVE SYSTEM)
A35C0OA
1
1
1. Gears aligned
After assembly, check for smooth mechanical
movement of the E-RAVE system.
E-RAVE HOUSING
Removal
Remove the following:
E-RAVE cables
no. 4
.
Cover
no. 11
.
NOTE:
E-RAVE housing with shaft and E-RAVE
valves can be removed altogether if desired.
A35C0NA
Drive gears
no. 7
.
Inspection
Check housing condition.
Installation
Reverse removal steps.
E-RAVE VALVES
Removal
Remove the following:
Cover
no. 11
.
Drive gears
no. 7
.
Housing
no. 10
.
Inspection
Clean carbon deposits on parts. Check gears con-
dition.
Installation
Reverse removal steps.
mmr2005-148
49
Содержание 2005 MACH Z
Страница 2: ......
Страница 3: ...2005 Shop Manual RT SERIES BOMBARDIER RECREATIONAL PRODUCTS INC...
Страница 40: ...Section 02 ENGINE Subsection 02 AIR INTAKE SYSTEM AIR INTAKE SYSTEM A35C02S mmr2005 149 15...
Страница 220: ...Section 06 DRIVE SYSTEM Subsection 03 DRIVEN PULLEY A35D1BA Install circlip mmr2005 133 207...
Страница 339: ...Section 11 WIRING DIAGRAMS Subsection 01 WIRING DIAGRAMS A35Z01S 2005 MACH Z RT SUMMIT RT ENGINE 334 MMR2005 146...
Страница 340: ...NOTES...
Страница 341: ...NOTES...
Страница 342: ...2005 MACH Z RT SUMMIT RT A35Z02...
Страница 343: ......